![](https://tfsystem.com/wp-content/uploads/2023/01/IMG_9899-1024x768.jpg)
Above is a photo from a new home construction build in 2022. These 10ft. tall walls were erected and poured by a crew the homeowner assembled together along with the help of a company approved independent contractor.
Here is a link to more TF System – the Vertical ICF for the Homeowner looking to build their own foundation